Waterproofness: Lower. Requires large cavity and specifically developed ties, flashings and cavity drainage. Cavity ties and weep holes need to be cleared of mortar droppings on completion. After i tensioned the roof cladding the working day temperature was about 20 degrees, the hotter the working day the better to get http://electrician77272.onesmablog.com/The-5-Second-Trick-For-Composite-Cladding-Mackay-23326422