The bid stage, also referred to as the tender period, requires possibly “open up” or “choose” bidding. Open up bidding is open to all contractors, although find bidding is barely open up to specific pre-selected contractors. Bids are analyzed with the general contractor and also the architect. If you have http://www.nicholsteam.com/construction-markets/education/