For work functions designated from the escalation line for disaster recovery designs, are personnel totally knowledgeable of their responsibilities and linked to testing those ideas? Thinking about adopting ISO 27001 but Not sure no matter if it can do the job for the Firm? Even though implementing ISO 27001 https://michaeld566icu8.blogscribble.com/profile